With a team of more than 75 coiled tubing and pumping specialists, our years of experience and proven track record demonstrates that we can deliver innovative and cost-effective solutions to our clients. Our multi-disciplined crews can integrate with our other service capabilities such as cased hole logging, providing the full service to the client and reducing costs.
In this video, the Altus Intervention team demonstrates how they responded quickly and efficiently to a client's challenge by providing an innovative and cost-effective solution. The engineering team proposed their Realtime Coiled Tubing system (RtC) run in conjunction with their Tension Adjusted Levelwind Operating System (TALOS). RtC provides real-time surface readout (SRO) of key downhole operating parameters, all logging data and the perforation initiation. The bespoke TALOS system, enabled Coiled Tubing operations to be undertaken from the LWI vessel – in this case, the Helix Well Enhancer.