Spec Sheet:

Coiled Tubing & Pumping

Coiled Tubing Towers


COILED TUBING TOWERS

Ideal for use in rig-less operations, Altus Intervention has experience in the design and manufacture of jacking tower systems including skidding systems for multiple service operation.  We retain several options within our fleet for maximum flexibility in rig-up and operation.

APPLICATIONS

  • Combined with Hyster units, our support towers provide flexible operational access for both coiled tubing and wireline operations
  • Unique Slant Well Intervention Mast (SWIM) available for delivery of coiled tubing service into slanted well trajectories


FEATURES

  • Modular tower for adjustments in height and flexibility in deployment
  • Skidding systems allow simultaneous rig-up of CT and Wireline operations
  • Integral work platforms, stairwells and lighting for ease of access and safe working

 

BENEFITS

  • Ease of access in rig-less environments – such as onshore wells - to reduce the need for scaffolding
  • Certified anchor points for safe skidding operations
  • Reduced rig-up times and easier access for ongoing operations
  • Capability to design and manufacture bespoke skidding systems for client requirements

TECHNICAL SPECIFICATIONS

Specification

Detail

Towers

Various frames and towers available. 

DNV 2.7-1 lifting points. 

FIND OUT MORE

Talk to our experts

Stay up to date